Ornamental leadwork

The Coach House Clock Tower

Inadequate mechanical fixings and poor detailing contributed to a fairly substantial level of decay of this Coach-house Clock Tower. The Tower was revived from its rather dilapidated state by installing new timber substrate and undertaking localised repairs to the decayed timber frame sections.

The Bell Tower before and after restoration

lead bell tower beforelead bell tower after

Following this the lead roof covering was renewed in accordance with current standards and some amendments were made to the slate roof junction and detailing.

Leadwork detail before and after restoration

ornamental leadwork before ornamental leadwork after

Bespoke rainwater pipes and hopper heads in lead

lead rainwater pipes lead hopper head

This client was keen to utilise traditional materials and therefore this particular lead hopper and downpipe was designed to compliment the contemporary extension.


Lead Cowl for converted oast house

The timber sections were delivered in two sections and required a methodical and patient approach in order to acheive a professional finished product.

completed leadwork cowl
Timber former during lead cladding Completed lead sections assembled Complete with sand cast plaque